• 2023 8 Head SMT LED Chip Mounter L8 (TORCH)
  • 2023 8 Head SMT LED Chip Mounter L8 (TORCH)
  • 2023 8 Head SMT LED Chip Mounter L8 (TORCH)
  • 2023 8 Head SMT LED Chip Mounter L8 (TORCH)
  • 2023 8 Head SMT LED Chip Mounter L8 (TORCH)
  • 2023 8 Head SMT LED Chip Mounter L8 (TORCH)

2023 8 Head SMT LED Chip Mounter L8 (TORCH)

Automation: Automation
Max PCB Size: 1200*280mm
Max Mounting Speed: 18000 Cph
Mount Accuracy: +/-0.05mm
Position Method: Visual Position
Component Available: 0603 and Above SMD Component and LED, Sot, Sop
Samples:
US$ 10999/Piece 1 Piece(Min.Order)
| Request Sample

Contact Supplier

Diamond Member Since 2010

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
L8
Programmingmethod
0603 and Above SMD Component and LED, Sot, Sop
Belt Feeder
8mm, 12mm, 16mmand 24mm
Feeder Num
8 PCS of Gf Series Feeder Can Be Set(16 PCS Feeder
Compressed Air
Large Production Should Use Industrial Air Pump
Mounting Type
Inline Type
Warranty
1 Year
Transmission Type
Flexible
Automatic Production Line
Assembly
Certification
CE, ISO
Flexible Production
Intelligent Manufacturing
Rhythm
Flow Production Line
Production Scope
Product Line
Transport Package
Plywood Case or Other Packing
Specification
CE
Trademark
TORCH
Origin
Beijing, China
HS Code
8479896200
Production Capacity
100 Sets/Month

Product Description

2023 8 head SMT LED Chip Mounter L8 (TORCH)
  2023 8 Head SMT LED Chip Mounter L8 (TORCH)
                                                      
                                        https://yadi.sk/i/xkfnY_nJbLai9 
 
      Video Link
                                        https://yadi.sk/i/l_lCrNIOXiHig


                               We never Compete with any other Suppliers on Price!
             
                 We just produce World The First--Class SMT Pick and Place Machine!



Feature
 
1 Board driving system uses high precision stepper motor driving industrial belt, cooperating with precision guide-rail to achieve the improvement on placement accuracy and board driving speed.  
 
2 Mounting head driving system uses servo motor , together with high precision ball screw to achieve the completion of the LED component picking and placing.  
 
3 8 groups of mount head improves production efficiency of 500% than 1 group.
 
4 Visual programming automatically, without input component coordinates by hand. Programming is simple, fast  , meeting the needs of high-volume production of kinds of varieties.
 
5 Different sizes of smart feeder , which will not go forward if the component is stuck or isn't picked up, can meet different requirements of LED mount.
 
6 Cost-effective LED chip machine is most suitable for high-volume LED production.
 
7 The whole machine is controlled by industrial computer with professional software, easy to operate and use.  
 
8 Easy to import CAD data of the circuit board.  
2023 8 Head SMT LED Chip Mounter L8 (TORCH) 2023 8 Head SMT LED Chip Mounter L8 (TORCH) 2023 8 Head SMT LED Chip Mounter L8 (TORCH) 2023 8 Head SMT LED Chip Mounter L8 (TORCH)

We already Sold LED PCB Assemble Line to  India,  Egypt , Bangladesh,  South Africa,  Thailand....


Kindly contact with me

 

Send your message to this supplier

*From:
*To:
avatar Mrs. Diana
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now